Permanent safety measures for the ash basins of the La Spezia Thermoelectric Power Plant

Il Progetto

In September 2020, Impresa Manca acquired a contract from Enel for the permanent safety measures of the ash basins (MISP) coming from the coal residues used by the La Spezia thermoelectric power plant.

The area affected by the works was approximately 90,000 m2. and divided into two basins (A&B)

The scope of work of the €5.2 million contract included:

  • Continuous environmental monitoring
  • The removal of the forest created on the basins
  • The altimetric adjustment of the basins with disposal of dangerous products to landfill
  • The capping of the basins with TNT, 2.5 mm thick HDPE sheath, stabilization geogrid
  • Filling with topsoil
  • Construction of rainwater drainage channels
  • Planting of tree species

the work was completed in October 2022

Il tuo progetto

Richiedi un preventivo gratuito

I nostri preventivi sono completi di tutti i dettagli sulla durata dei lavori, sui materiali utilizzati e sugli strumenti da impiegare. Raccontaci il tuo progetto, riceverai un preventivo edile gratuito e senza impegno.